Marbelup Valley Railway - Construction Photos | |
|
We have built the layout in sections, typically 2 m long, so that it can be moved one day if necessary. The framing and sub-roadbed is 9 mm plywood with the roadbed being 9 mm MDF (medium density fibreboard). Most of the scenery is shaped from layers of polystyrene foam, apart from the Marbelup River area where we experimented with spray-on foam. The spray-on foam wasn't a great success, so we used sheet foam for the remaining scenery. | |
![]() |
Spray FoamThis shows the half-way stage in making scenery from the spray foam sold as a gap filler.We found the best way was to spray strips, then go back later to fill in the gaps. Attempting to spray a large expanse in one go, resulted in excessive expansion and numerous, large bubbles in the foam. |
![]() |
Spray FoamMore spray foam, on the hill behind Marbelup River.The 'water' is a solid sheet of plywood. The bits of cardboard just above the 'water' are for rock outcrops, precast in black foam, which we bought from the local hobby shop. |
![]() |
Pouring the RiverAt this stage, we have just mixed and poured Envirotex, to make the Marbelup River.Judith is actually blowing on the surface through a straw, which releases any bubbles in the liquid resin. |
![]() |
Approach to FreycinetThe unfinished scenery on the left is a combination of spray-on foam (yellow) and sheet polystyrene foam (white).We trialled the spray foam in this area (around Marbelup River) but used sheet foam for the remainder of the scenery. |
![]() |
Gluing Sheet FoamLayers of styrene foam being glued down, prior to shaping the scenery in the Yelverton Mill area. |
![]() |
Foam SceneryLayers of foam, almost ready for shaping near Yelverton station. |
![]() |
Zip TexturingWe used zip texturing - sifting on a mix of dry poster paint and plaster of Paris - to quickly add a basic texture to the scenery. |
![]() |
Timber TrestleThe timber trestle which carries the timber line over Ten Mile Gully under construction. |
![]() |
Freycinet StationThe part finished station building (September 2001). The brick walls are Design Preservation Models HO modules. I painted the walls before adding the styrene angle brackets which support the roof. Compare with finished station. |
| MVR Home | Guided Tour | Favourite Rolling Stock | Control Systems |
| Updated 5 May 2004 |