2011-06-27 153_edited
Bath room contents all bagged up
2011-06-27 154_edited
Three weeks of black plastic
2011-06-27 155_edited
Old throne which was recycled
2011-06-27 156_edited
The old bath
2011-06-27 157_edited
Old toilet entrance
2011-06-27 158_edited
Where the bath and shower where
2011-06-27 159_edited
Old sink and bath area
2011-06-27 160_edited
Old toilet and sink area
2011-06-27 161 2011-06-27 162_edited 2011-06-28 164
Portable bath room
2011-06-28 165_edited
Interior view
2011-06-28 167_edited
Location - a hop step and jump from the front door
2011-06-30 168
Bath room during concreting
2011-06-30 169 2011-06-30 170 2011-06-30 171 2011-07-01 172 2011-07-01 173 2011-07-01 174
New plaster goes over old ceiling
2011-07-01 175 2011-07-02 176
Old kitchen floor which took two jack hammers to get up
2011-07-05 177 2011-07-05 178
Ready to tile
2011-07-05 179
Every thing went into the lounge room
2011-07-05 180
New bath in place for fitting check
2011-07-05 181 2011-07-10 182
Wall tiles go up
2011-07-10 184 2011-07-10 185 2011-07-10 186 2011-07-10 187_edited 2011-08-13 272_edited
Oh look its finished. Note the tall revolving cabinet.
2011-08-13 273_edited 2011-08-13 274_edited 2011-08-13 275_edited 2011-08-13 276_edited
Mirror on back of revolving cabinet
2011-08-13 277_edited
Sliding door entrance to bath room
2011-08-13 279_edited 2011-08-13 281 2011-08-13 282_edited 2011-08-13 283