YOUR COMPLETE ENGINEERING SERVICE

Our Workshop Facilities

Stage 1 of Rolliston Engineering's workshop facility in Wangara was completed in 2001.  This workshop consists of 1100 square meters under roof and has been designed with a high roof (15 meters to the gutters) so as to allow for the 8000mm x 7500mm doors plus an overhead crane with 8500mm of useful lift.  Currently both the machine workshop and the fabrication workshops are contained in this building. Stage two consists of the office complex which has now commenced and is due for completion in 2004.  This complex will provide office space for three engineering offices, CNC programming and administration.  The third and final stage is the construction of a second factory building connecting to the rear of the original building.  The machine workshop will be moved into this building with the fabrication section taking over all of the original workshop.  

THE WORKSHOP IN WANGARA WITH IT'S 8000mm WIDE X 7500mm HIGH DOORS

AN INSIDE VIEW OF THE MACHINE SHOP

 

 

ONE SIDE OF THE FABRICATION WORKSHOP WITH A 10 TON

 FORKLIFT MOVING A 5 TON FABRICATION WHICH

 IS BEING LINE BORED.