Sevtec Surveyor

Build methods, errors and fixes....

 

hb016.jpg
hb016.jpg

81.44 Kb

Glass over matt, I am very pleased with myself for getting this one done.

hb017.jpg
hb017.jpg

83.56 Kb

Yeee..haaa!!... on a roll now, two sides done.

Hard points…. What hard points??   Doh!

 

hb020.jpg
hb020.jpg

72.19 Kb

Now to create hard points after the fact!

Drill 3/8” hole thru 1 layer of glass and foam.

 

hb022.jpg
hb022.jpg

78.56 Kb

Borrow wire coat  hanger from wife, cut and bend piece
to create ½” leg, insert to drill.

hb023.jpg
hb023.jpg

74.08 Kb

Push “bit” into foam and start drill.

hb025.jpg
hb025.jpg

70.46 Kb

Rotate around hole in glass and up and down,
touching carefully on bottom glass layer.

hb027.jpg
hb027.jpg

69.09 Kb

Vacuum out excess.

hb029.jpg
hb029.jpg

89.04 Kb

Check for size….lol

hb030.jpg
hb030.jpg

66.46 Kb

Mix up filler and pipe in like cake decorating.
Surprise wife with new icing bag and nozzles.

hb032.jpg
hb032.jpg

87.81 Kb

H7 left and right in progress.

Home|Previous Page|Next Page

Go directly to page…..

1, 2, 3, 4, 5, 6, 7, 8, 9, 10

11, 12, 13, 14, 15, 16, 17, 18, 19, 20

 

Page 2 of 12