Sevtec Surveyor

Build methods, errors and fixes....

 

hb034.jpg
hb034.jpg

52.30 Kb

That little table saw made these timber strips  an easier job.

hb049.jpg
hb049.jpg

84.56 Kb

H9, left and right in progress.

hb050.jpg
hb050.jpg

65.31 Kb

H11, left and right.
These are modified for the longer craft so they appear different than on the drawing.

hb051.jpg
hb051.jpg

55.95 Kb

H1 under way.

hb052.jpg
hb052.jpg

56.77 Kb

Tip for not getting glass stuck on resin coated gloves.

hb053.jpg
hb053.jpg

61.67 Kb

Cut glass to oversize, roll onto PVC pipe, apply resin to foam.

Then roll glass onto wet resin.

This helped me keep my sanity from pulling cloth out of whack!

 

hb055.jpg
hb055.jpg

99.46 Kb

Most of the completed panels ready, just needing beveled edges.

hb060.jpg
hb060.jpg

60.25 Kb

I think the hard point was needed, but it is not the standard 11”

hc000.jpg
hc000.jpg

39.93 Kb

Anti wash coaming was produced in 4 pieces then joined into final 2 parts.

 

hc001.jpg
hc001.jpg

40.85 Kb

A little larger foam profile used.

Electric router was run down the external edges.

NOTE: The glass wraps around so much nicer.

 

Home|Previous Page|Next Page

Go directly to page…..

1, 2, 3, 4, 5, 6, 7, 8, 9, 10

11, 12, 13, 14, 15, 16, 17, 18, 19, 20

 

Page 3 of 12